FNVi — creating simpler solutions
Blog

Guides for delivering complex projects

Completions, commissioning, inspection, handover and site safety — practical guidance from the team behind Accord.

Commissioning

Writing Commissioning Test Procedures: Structure, Hold Points and Sign-Off

How to write a commissioning test procedure: structure, prerequisites, isolations, step-by-step expected results, hold points, acceptance criteria and sign-off.

12 November 2026 10 min read
Completions

System Walkdown: How to Run One Before Mechanical Completion

How to run a system walkdown before mechanical completion: who attends, how to prepare, running the walk, capturing punch items with photos, and closing out.

9 November 2026 8 min read
Completions

The Tag Register: The Foundation of Every Completions System

What a tag register is, the attributes each tag needs, tag numbering conventions, and how to link tags to systems and ITRs and keep it in sync with engineering.

5 November 2026 8 min read
Commissioning

Ready for Start-Up (RFSU): What It Means and How to Get There

Ready for start up (RFSU) explained: what it confirms, its prerequisites, how it relates to a pre-start-up safety review, and the evidence operations need.

4 November 2026 8 min read
Commissioning

Cold Commissioning vs Hot Commissioning: Stages, Activities and Risks

Cold commissioning vs hot commissioning: what each stage involves, typical activities, the transition point, and the safety and document gates between them.

2 November 2026 7 min read
Handover

What Goes in a Handover Dossier? The Complete Turnover Package Checklist

What goes in a handover dossier: certificates, ITRs, punch status, vendor data, as-builts, O&M manuals and spares, plus how to build one per system.

29 October 2026 10 min read
Commissioning

How to Write a Commissioning Plan (with a Section-by-Section Outline)

How to write a commissioning plan: a section-by-section outline covering scope, organisation, systemisation, sequence, procedures, records, handover and safety.

26 October 2026 8 min read
Inspection & QA/QC

Hold Points and Witness Points: A Practical Guide for Inspection and Test Plans

Hold point and witness point explained: H, W, R and S intervention points in an ITP, who releases a hold, notice periods and what if a witness is missed.

22 October 2026 8 min read
Inspection & QA/QC

ITP vs ITR vs Checksheet: How Inspection Documents Fit Together

ITP vs ITR explained: how inspection and test plans, inspection test records, checksheets and certificates fit together in project QA/QC and completions.

21 October 2026 9 min read
Commissioning

Systemisation in Commissioning: How to Break a Project into Systems and Subsystems

Systemisation in commissioning explained: how to split a project into systems and subsystems, set boundaries, number them, mark up P&IDs and freeze the split.

19 October 2026 7 min read
Commissioning

Commissioning Certificates Explained: MCC, RFC, RFSU, TOC and More

Commissioning certificates explained stage by stage: what MCC, RFC, RFSU and TOC certify, their prerequisites, and why enforced sequencing stops early sign-off.

15 October 2026 8 min read
Completions

Punch List Categories A, B and C: How to Classify Punch Items

Punch list categories A, B and C explained: what each means, which certificates they block, who raises and clears them, and how to keep a punch list clean.

12 October 2026 8 min read
Completions

Mechanical Completion Explained: Definition, Criteria and Certificate

What mechanical completion means, the criteria a system must meet, and how the MCC is issued — a practical guide for completions and commissioning teams.

8 October 2026 8 min read
Commissioning

Pre-Commissioning vs Commissioning: What’s the Difference?

Pre-commissioning vs commissioning explained: scope, energy state, typical activities, A and B ITRs, and the certificates that close each stage of a project.

7 October 2026 8 min read
Completions

What Is a Completions Management System? A Complete Guide

A completions management system tracks every tag, ITR, punch item and certificate by system through to handover. How it works and when spreadsheets stop coping.

5 October 2026 9 min read

Ready to bring your projects on-stream faster?

See how FNVi can cut project personnel spend, de-risk handover and turn your data into business intelligence. Book a walkthrough with our team.